Integrated management system: what it is and when you need it
An integrated management system, or IMS, is a single management system that meets the requirements of several standards at once. For example, quality, environment and occupational health and safety.
Where the need comes from
A company rarely needs just one certificate. A customer asks for ISO 9001, the environmental team for ISO 14001, the health and safety department for ISO 45001. If they are implemented one after another and independently, you end up with three systems:
- Three sets of documents that largely duplicate each other
- Three rounds of internal audits a year
- Three reports to management
- Three responsible people who know little about what the other two are doing
People on the ground see this as three extra burdens instead of one clear one.
Why the standards can be combined
Modern ISO management system standards are built on a common structure. They have the same clauses: context of the organization, leadership, planning, support, operation, performance evaluation, improvement. The common requirements are almost word for word the same.
So the common elements can be done once:
- One policy that covers quality, the environment and safety
- One document control procedure
- One internal audit procedure
- One management review
- One procedure for dealing with nonconformities
Only the specific content differs: in ISO 14001 it is environmental aspects, in ISO 45001 workplace hazards and risks, in ISO 50001 energy consumption.
Which standards are combined
Most often:
- ISO 9001 — quality
- ISO 14001 — environment
- ISO 45001 — occupational health and safety
Depending on the company’s profile, these are added:
- ISO 50001 — energy management
- ISO 22000 — food safety
- ISO/IEC 27001 — information security
What integration gives you
- Fewer documents. One set instead of several.
- Fewer audits. One internal audit covers all the standards.
- Consistent decisions. A change in a process is assessed for quality, environment and safety at once, rather than three times separately.
- Certification in one project. Certification bodies carry out combined audits.
- Less burden on people. For an employee, it is one set of rules.
When you need an IMS
- The company needs two or more certificates
- It already has one certificate and plans the next
- Separate systems have already been implemented and get in each other’s way
When it is better to start with one system
- You need only one certificate, and no other requirements are expected
- The company has no described processes at all: it helps to bring order to one area first
- The deadline is tight, and you need a certificate to one standard by a specific date
A system built to one standard can be extended later: the common structure is already there.
How it is implemented
The stages are the same as for a single system, but the requirements of all the standards are considered at once:
- Analysis of the current management system
- Training of management and specialists
- Describing processes with all areas in mind
- Developing a single set of documents
- Implementation
- Training of IMS internal auditors
- Internal audit and management review
- Certification audit
Full implementation takes from two months to a year, five months on average.