Typical projects
How implementation works: four typical projects
These are generalized scenarios, not descriptions of specific clients. They show where the work starts, which steps follow and what the company is left with. We give you the exact timing and scope of work after a diagnostic review.
ISO 9001
Manufacturing: a full quality management system
- Who it is for
- A manufacturing company, for example with 200 employees, that needs ISO 9001 certification for tenders and large customers
- Duration
- 5 months on average
What we do
- We look at how the company is managed today and compare it with the requirements of ISO 9001
- We train top management and key specialists in the requirements of the standard
- Together with the process owners, we describe the core and support processes
- We develop the documents: policy, objectives, procedures, process indicators
- We implement: departments start working according to the new documents
- We train internal auditors from among your staff
- We carry out an internal audit, close the nonconformities and prepare the management review
- We support you during the certification audit by the certification body
What the company is left with
- Process maps
Core and support processes are described: each has an owner, and it is clear what comes in, what comes out and which departments the process is linked to.
- A complete set of documents
Mission, quality policy and objectives, documented procedures, instructions and regulations, departmental regulations and job descriptions.
- Process indicators
Key indicators for each process and the procedure by which management reviews them and makes decisions.
- Your own internal auditors
Trained employees, an audit programme and a report on the first internal audit with the nonconformities closed.
- A procedure for nonconformities
It is clear who handles defects and complaints and how, who looks for the cause and checks that the problem has not recurred.
- ISO 9001 certificate
A certificate from the certification body. Valid for three years, with a surveillance audit by the body once a year.
HACCP, ISO 22000
Food production: HACCP from scratch
- Who it is for
- A food manufacturer or food service company required to have HACCP by regulation and by its customers
- Duration
- 2 months to a year, 5 months on average
What we do
- We walk through production from receiving raw materials to shipping and compare it with the requirements
- We train top management and the HACCP team
- We draw up the prerequisite programme
- We identify hazards and assess the risks at every stage
- We use a decision tree to determine the critical control points
- We develop HACCP plans, procedures and record forms
- We implement the system and train internal auditors
- We carry out an internal audit and support you through certification
What the company is left with
- HACCP plans
For each type of product: hazards, critical control points, critical limits, monitoring procedure and corrective actions.
- Production flow diagrams
Product descriptions and process flow diagrams from receiving raw materials to shipping, verified on site in the workshop.
- Prerequisite programme
Written rules for the cleanliness of premises and equipment, water, pest control and staff hygiene.
- Control at critical points
Each point has a responsible person, with defined measurements, frequency and actions if the limit is breached.
- A trained HACCP team
Employees who understand the HACCP principles, run the system themselves and carry out internal audits.
- Records and certificate
Forms and logs you can show to inspectors and customers. ISO 22000 certification if needed.
IMS: ISO 9001, ISO 14001, ISO 45001
Industrial company: three standards in one system
- Who it is for
- An industrial or energy company that needs quality, environmental and health and safety certificates at the same time
- Duration
- 2 months to a year, 5 months on average
What we do
- We compare your current management system with the requirements of all three standards at once
- We train top management and key specialists
- We describe the processes once, covering quality, environment and health and safety
- We identify environmental aspects and workplace hazards and assess the risks
- We develop a single set of IMS documents
- We implement the system and train IMS internal auditors
- We carry out one internal audit and one management review for all the standards
- We support you during the certification audit
What the company is left with
- One system instead of three
A single mission, policy and objectives that cover quality, the environment and health and safety.
- A single set of documents
Common procedures — document control, audits, handling nonconformities — are written once for all the standards.
- Assessed aspects and risks
Environmental aspects are identified and evaluated, with programmes for the significant ones. Workplace hazards are identified, risks are assessed and emergency response plans are developed.
- IMS internal auditors
Trained employees who check the requirements of all the standards in a single audit.
- One management review
Top management considers quality, the environment and health and safety together and makes consistent decisions.
- Certificates for the chosen standards
Certificates from the certification body, obtained in a single project.
Kaizen
One area: kaizen in 2–4 weeks
- Who it is for
- A company that wants to test the approach in one area or a small department before rolling it out everywhere
- Duration
- 2 weeks to a month
What we do
- We collect information about the area and study the process in advance
- We select people for the kaizen team and train them
- We explain the project to managers and discuss possible difficulties
- We work in the pilot area: the kaizen team spends time there every day with each shift
- We collect workers’ suggestions and introduce an improved work standard
- We show the results to the whole company and recognize the participants
What the company is left with
- A work standard for the area
An improved work procedure, written down and accepted by the people who work to it.
- A system of indicators
Indicators that show the results of the work and the quality of the process.
- Workers’ suggestions
Collected improvement suggestions: some are already implemented, and it is clear what to do with the rest.
- Less waste
Losses of time, labour, materials and energy are reduced — which ones depends on the area.
- Discipline in the area
Workers take better care of equipment and resources, keep the area clean and follow the standard work procedure.
- An experienced team
A kaizen team that has mastered the tools in practice and can move on to the next areas by itself.
Photos







