Typical projects

How implementation works: four typical projects

These are generalized scenarios, not descriptions of specific clients. They show where the work starts, which steps follow and what the company is left with. We give you the exact timing and scope of work after a diagnostic review.

ISO 9001

Manufacturing: a full quality management system

Who it is for
A manufacturing company, for example with 200 employees, that needs ISO 9001 certification for tenders and large customers
Duration
5 months on average
Discuss on WhatsApp

More about the service and prices

What we do

  1. We look at how the company is managed today and compare it with the requirements of ISO 9001
  2. We train top management and key specialists in the requirements of the standard
  3. Together with the process owners, we describe the core and support processes
  4. We develop the documents: policy, objectives, procedures, process indicators
  5. We implement: departments start working according to the new documents
  6. We train internal auditors from among your staff
  7. We carry out an internal audit, close the nonconformities and prepare the management review
  8. We support you during the certification audit by the certification body

What the company is left with

  • Process maps

    Core and support processes are described: each has an owner, and it is clear what comes in, what comes out and which departments the process is linked to.

  • A complete set of documents

    Mission, quality policy and objectives, documented procedures, instructions and regulations, departmental regulations and job descriptions.

  • Process indicators

    Key indicators for each process and the procedure by which management reviews them and makes decisions.

  • Your own internal auditors

    Trained employees, an audit programme and a report on the first internal audit with the nonconformities closed.

  • A procedure for nonconformities

    It is clear who handles defects and complaints and how, who looks for the cause and checks that the problem has not recurred.

  • ISO 9001 certificate

    A certificate from the certification body. Valid for three years, with a surveillance audit by the body once a year.

HACCP, ISO 22000

Food production: HACCP from scratch

Who it is for
A food manufacturer or food service company required to have HACCP by regulation and by its customers
Duration
2 months to a year, 5 months on average
Discuss on WhatsApp

More about the service and prices

What we do

  1. We walk through production from receiving raw materials to shipping and compare it with the requirements
  2. We train top management and the HACCP team
  3. We draw up the prerequisite programme
  4. We identify hazards and assess the risks at every stage
  5. We use a decision tree to determine the critical control points
  6. We develop HACCP plans, procedures and record forms
  7. We implement the system and train internal auditors
  8. We carry out an internal audit and support you through certification

What the company is left with

  • HACCP plans

    For each type of product: hazards, critical control points, critical limits, monitoring procedure and corrective actions.

  • Production flow diagrams

    Product descriptions and process flow diagrams from receiving raw materials to shipping, verified on site in the workshop.

  • Prerequisite programme

    Written rules for the cleanliness of premises and equipment, water, pest control and staff hygiene.

  • Control at critical points

    Each point has a responsible person, with defined measurements, frequency and actions if the limit is breached.

  • A trained HACCP team

    Employees who understand the HACCP principles, run the system themselves and carry out internal audits.

  • Records and certificate

    Forms and logs you can show to inspectors and customers. ISO 22000 certification if needed.

IMS: ISO 9001, ISO 14001, ISO 45001

Industrial company: three standards in one system

Who it is for
An industrial or energy company that needs quality, environmental and health and safety certificates at the same time
Duration
2 months to a year, 5 months on average
Discuss on WhatsApp

More about the service and prices

What we do

  1. We compare your current management system with the requirements of all three standards at once
  2. We train top management and key specialists
  3. We describe the processes once, covering quality, environment and health and safety
  4. We identify environmental aspects and workplace hazards and assess the risks
  5. We develop a single set of IMS documents
  6. We implement the system and train IMS internal auditors
  7. We carry out one internal audit and one management review for all the standards
  8. We support you during the certification audit

What the company is left with

  • One system instead of three

    A single mission, policy and objectives that cover quality, the environment and health and safety.

  • A single set of documents

    Common procedures — document control, audits, handling nonconformities — are written once for all the standards.

  • Assessed aspects and risks

    Environmental aspects are identified and evaluated, with programmes for the significant ones. Workplace hazards are identified, risks are assessed and emergency response plans are developed.

  • IMS internal auditors

    Trained employees who check the requirements of all the standards in a single audit.

  • One management review

    Top management considers quality, the environment and health and safety together and makes consistent decisions.

  • Certificates for the chosen standards

    Certificates from the certification body, obtained in a single project.

Kaizen

One area: kaizen in 2–4 weeks

Who it is for
A company that wants to test the approach in one area or a small department before rolling it out everywhere
Duration
2 weeks to a month
Discuss on WhatsApp

More about the service and prices

What we do

  1. We collect information about the area and study the process in advance
  2. We select people for the kaizen team and train them
  3. We explain the project to managers and discuss possible difficulties
  4. We work in the pilot area: the kaizen team spends time there every day with each shift
  5. We collect workers’ suggestions and introduce an improved work standard
  6. We show the results to the whole company and recognize the participants

What the company is left with

  • A work standard for the area

    An improved work procedure, written down and accepted by the people who work to it.

  • A system of indicators

    Indicators that show the results of the work and the quality of the process.

  • Workers’ suggestions

    Collected improvement suggestions: some are already implemented, and it is clear what to do with the rest.

  • Less waste

    Losses of time, labour, materials and energy are reduced — which ones depends on the area.

  • Discipline in the area

    Workers take better care of equipment and resources, keep the area clean and follow the standard work procedure.

  • An experienced team

    A kaizen team that has mastered the tools in practice and can move on to the next areas by itself.

Photos

Work on site

  • The company’s working group reviews integrated management system documents
  • Talking to a farm employee during the walk-through
  • The working group reviews a process diagram
  • Walk-through of a livestock farm with company staff
  • Company staff review management system documents
  • Walk-through of a company warehouse
  • Session with company staff: reviewing a diagram on the screen
  • On-site work: inspecting a tanker truck