Blog · Lean
The 5S system: what it is, the five steps and examples
5S is a system for organizing the workplace. It answers a simple question: how to make sure that everything you need is at hand, there is nothing superfluous, and order keeps itself without a big clean-up before every inspection.
The name comes from five Japanese words beginning with “s”. In English they are also usually rendered with words beginning with “S”.
The 5S explained
| Step | Japanese word | Meaning |
|---|---|---|
| 1. Sort | seiri | Remove what is not needed |
| 2. Set in order | seiton | A place for everything |
| 3. Shine | seiso | Clean and inspect |
| 4. Standardize | seiketsu | Fix it in rules |
| 5. Sustain | shitsuke | Keep it up and improve it |
The five steps
1. Sort
Separate what is needed from what is not and remove what is not.
Only what is used stays at the workplace. For everything else, a decision is made: move it, give it away, write it off. A handy technique is red tags: a tag with a date is hung on a doubtful item, and if it has not been needed within the agreed time, it is removed.
2. Set in order
Everything has its place, and the place is visible.
- The more often an item is used, the closer it is kept
- Places are marked: tool outlines on a board, lines on the floor, labels on shelves
- Putting an item back is as easy as taking it
The test is simple: an outsider should be able to find the tool they need in half a minute and see what is missing.
3. Shine
Clean and inspect at the same time.
Cleanliness here is not for looks. On clean equipment you can see an oil leak, a crack, a loose fastener. Cleaning is assigned to the people who work in the area and scheduled: what, who, when.
4. Standardize
Fix the first three steps in rules.
Photos of the workplace in its model state, a marking diagram, a cleaning schedule, a short checklist. The standard should fit on one sheet and hang where people work.
5. Sustain
Keep order and improve it.
The hardest step: it is about habit. Regular walk-throughs, checks against the checklist, reviewing findings, new suggestions from workers.
Where it is used
- Production. Tools, fixtures, containers, aisles.
- Warehouses. Location-based storage, zone markings, clear labels.
- Offices. Shared folders and files with a common structure, consumables, archives.
- Healthcare and laboratories. Arrangement of materials and instruments, labelling.
Examples of 5S
The examples are hypothetical: they illustrate the idea, not the results of a specific company.
| Place | Before | After |
|---|---|---|
| Fitter’s area | Tools in a shared box, five minutes to find one | A shadow board: you can see what has not been returned |
| Warehouse | Pallets stand wherever there is room | Marked zones and location addresses on the shelves |
| Office | Files in a shared folder with no structure | A common folder structure and naming rules |
| Laboratory | Reagents and instruments in different cabinets | Labelling and fixed places |
What 5S gives you
- Less time is spent searching
- Equipment faults are noticed earlier
- Fewer injuries: aisles are clear, nothing lies underfoot
- Fewer defects caused by mixed-up parts and materials
- New workers settle in more easily
In addition, 5S usually becomes the first step towards lean manufacturing: in an area without order, other tools do not take root.
Why order does not last
- A one-off clean-up was called 5S. Cleaned once, no standard and no checks — a month later everything is back as it was.
- The manager does not visit the area. If only the supervisor checks, the system lasts until the first rush job.
- The markings were designed in an office. The places should be chosen by the people who work there.
- The work stopped at step three. Without a standard and a habit, the first three steps have to be repeated all over again.
Where to start
- Choose one area, preferably where the mess gets in the way the most
- Take “before” photos of it
- Sort together with the workers in the area
- Decide on places and apply markings
- Agree on cleaning and inspection
- Write the standard with “after” photos
- Schedule regular walk-throughs and show the result to others a month later
5S removes waste related to searching and movement. The other types of waste — overproduction, inventory, defects, waiting — are covered in the article “Lean manufacturing: the 7 types of waste and the eighth”.