Service · Lean manufacturing

Implementing lean manufacturing in Kazakhstan

Lean manufacturing is a management approach in which everything that does not create value for the customer is systematically removed from processes. It gives long-term competitiveness without major capital investment. We carry out a diagnostic review, rebuild the flow and train your people.

Discuss on WhatsApp

Process

Implementation stages

First a diagnostic review with a written report, then the changes. We work together with your representatives at every stage.

  1. Interviews with key managers: stage of business development, 3–5-year strategy, cost structure
  2. Analysis of internal regulations, the organizational structure and the distribution of functions
  3. Identifying core and support processes, value stream analysis
  4. Measuring process costs; work-day observation and time studies
  5. Written report: bottlenecks, duplicated functions, unnecessary operations — and a list of measures
  6. Flow optimization: time and output standards, restructuring of operations
  7. Pull system, inventory management, coordination between departments, planning
  8. Process indicators, implementation support, performance monitoring and manager training

Timing and cost

From 2 weeks to 1 year

Targeted: 2 weeks to a month

We improve a single small process or the work of a small department.

from 800,000 ₸

Full project: 1 month to a year

Full implementation of lean tools at the company. Takes 5 months on average.

from 2,000,000 ₸

Prices exclude VAT. The cost depends on the number of activities and the size of the company. The price is fixed in the contract and does not change during the work.

Waste

The seven types of waste lean deals with

  • Overproduction
  • Unnecessary transportation
  • Waiting
  • Excess inventory
  • Defects
  • Over-processing
  • Unnecessary motion

Outcome

What lean manufacturing gives you

  • Lower costs and higher profitability
  • Flexible production that responds to changes in demand without waste
  • Higher quality of products and services at every stage
  • Faster launch of new products
  • Better coordination between departments
  • Less production and storage space for the same work

Reviews

What clients say about our specialists

Reference letter from KazMotor LLP, 2017

Lean manufacturing · 2017

We thank you for the prompt and high-quality training and assistance in implementing the Lean production system at our company. <…> As a result of the measures taken together with the consultants, an economic effect of 23% was achieved in 11 months by eliminating waste, budgeting with the new method and implementing the Lean tools described above.

KazMotor LLPDirector O. M. Markarov

Open the letter · Original letter in Russian

All client reviews

Questions

Frequently asked questions

What is lean manufacturing in simple terms?

It is a way of organizing work so that you do not spend time, money and effort on what the customer does not need. Excess inventory, waiting, movement, defects and other waste are removed from processes.

Where does lean implementation start?

With a diagnostic review: interviews with managers, analysis of processes and the value stream. As a result, you receive a written report with the bottlenecks and a list of measures.

How long does implementation take?

From 2 weeks, if you need to improve a single process. Full implementation takes from 1 month to a year, 5 months on average.

Is lean only for manufacturing?

No. The approach is used in services, logistics and office processes: wherever there is a flow of work and waste in it.

Training

Related seminars

We run a three-day seminar “Lean production”, as well as seminars on kaizen and Six Sigma.

Consulting and seminars are delivered in Russian. You can contact us in English.

Programmes and prices