Lean manufacturing: the 7 types of waste and the eighth
Lean manufacturing divides everything that happens in a company into two parts: activities the customer is willing to pay for, and everything else. Everything else is called waste — in Japanese, “muda”. The task is to find waste and remove it.
This work has several goals: to reduce labour and lead times, free up space, guarantee delivery to the customer and achieve maximum quality at minimum cost.
The classic list has seven types. Many sources also speak of “8 wastes”: the eighth type was added later and is covered below.
In brief: the seven types of waste
| No. | Waste | Where it usually hides |
|---|---|---|
| 1 | Overproduction | Batches made “just in case”, finished goods warehouse |
| 2 | Transportation | Moving goods between workshops and warehouses |
| 3 | Waiting | Waiting for material, a setter, a signature |
| 4 | Inventory | Raw material stores, work in progress |
| 5 | Defects | Rework, sorting, complaints |
| 6 | Over-processing | Double checks, unnecessary precision, reports nobody needs |
| 7 | Motion | Looking for tools, walking to fetch fixtures |
1. Overproduction
Making more, earlier or faster than the next step or the customer needs.
Example: an area stamps parts a month ahead because “the machine must not stand idle”. The parts sit in the warehouse, taking up space and money, and if the drawing changes, they go for scrap.
Overproduction is considered the most dangerous waste: it gives rise to the others — inventory, extra transport, defects that go unnoticed for a long time.
2. Transportation
Moving materials and products in a way that adds nothing to them.
Example: a blank is taken from the warehouse to the workshop, from there to painting in another building and back to assembly. Every trip means time, a forklift and the risk of damaging the product.
3. Waiting
People or equipment wait: for material, a tool, a decision, a setter, a signature.
Example: a team stands idle for forty minutes at the start of a shift because the components have not been delivered. In an office, the same waste looks like a contract waiting three days for approval.
4. Inventory
Raw materials, work in progress and finished goods beyond what is needed.
Example: the warehouse holds six months’ supply of packaging “just in case”. Inventory ties up money and hides problems: as long as there is stock, supply failures and defects are not visible.
5. Defects
Defects, rework, sorting, complaints.
Example: a dimension went out of tolerance but was noticed only at assembly, when the whole batch had been spoiled. Material, time and labour at every previous operation have been lost.
6. Over-processing
Work the customer does not need: excessive precision, double checks, reports nobody reads.
Example: a part is ground to a finish that the product does not require. Or an employee enters the same data into three different spreadsheets.
7. Motion
Steps, bending, searching — movements of a worker that create no value.
Example: a fitter walks to a shared cabinet for tools twenty times a shift. An operator looks for the right fixture in a box where everything is thrown together.
8. Non-utilized talent
The eighth type of waste is not included in every source, so some lists have seven types of waste and others eight. In English it is called non-utilized talent.
The essence: the knowledge, experience and ideas of workers go unused. A worker sees how to do things better, but nobody asks them.
Example: an operator has long known why the machine stops in the middle of a shift, but there is nobody to suggest a fix to and nowhere to submit it. Another example: a person with the right qualifications is kept on an operation where those qualifications are not needed.
This waste is not found with a tape measure and a stopwatch, but by talking to workers and through a working suggestion system. That is what kaizen does.
How to find waste in your company
- Go to the place. Waste can be seen in the workshop and the warehouse, not in reports. Stand by an area for an hour and write down what happens.
- Follow the path of one product. From order to shipment: how long it is being processed and how long it just sits. Usually it sits many times longer.
- Draw a value stream map. This is a diagram of all the steps with the time for each and the inventory between them.
- Ask the workers. They know what gets in their way better than any consultant.
Where to start eliminating it
Not with everything at once. Choose one area or one flow, remove the most visible waste, fix the new order in a standard and show the result to others. A single process can be improved in two to four weeks.
Frequently asked questions
How many types of waste are there: seven or eight?
The classic list has seven types. The eighth, non-utilized talent, is not added by all authors. So some sources say “7 wastes” and others “8 wastes”. In practice, what matters is not the number but the habit of looking for waste on site rather than in reports.
What is “muda”?
“Muda” is the Japanese word used in lean manufacturing for waste: any activity that consumes time, money or resources but does not create value for the customer. The seven types of waste are a classification of muda.
How does muda differ from “muri” and “mura”?
In Japanese lean terminology, two more sources of problems are named alongside waste (muda): overburdening people and equipment (muri) and unevenness of work (mura). Uneven workload causes both overburden and waiting, and they in turn cause waste.
Which waste should we start with?
The one that is most visible in your area and can be removed in a few weeks. Overproduction is considered the most dangerous type, but it is harder to remove: it is tied to planning and habits. To begin with, it is easier to tackle waiting, unnecessary motion or disorder at workplaces — this is where the 5S system helps.
Do the seven types of waste apply to offices and services?
Yes. Waiting in an office looks like documents waiting for approval, defects like errors in contracts and invoices, over-processing like data entered into several spreadsheets. The classification works equally well in the workshop, the warehouse and the office.
How does lean manufacturing differ from kaizen?
Kaizen is continuous improvement by the workers themselves, a culture of small steps. Lean manufacturing adds tools for finding and eliminating waste. In practice they are used together; more in the article “Kaizen: what it is”.